Cabana Gențiana
Retezat Mountains · May 8, 2026

We lost the cabin in one night.We rebuild it in one year.

On the night of May 8, 2026, fire took in four hours a cabin that hikers had called home for 58 years. The rest is up to us.

Before
After
Foundation, chimney and the four front steps
The cabin in autumn light
September 2025
May 9, 2026
Slide left–right

Drag the slider — see what was, and what remained

High in the wild heart of the Retezat, in the Pietrele valley, a wooden building rose in 1963 that would become more than a shelter: Cabana Gențiana. At 1,670 metres, it watched over the stream and offered respite to hikers climbing toward the high peaks and the glacial lakes.

Its story was one of resilience. After the 1990s left it nearly forgotten and in disrepair, Gențiana was given new life in 1998. Under the care of the „Floarea Reginei” Association, the cabin became a symbol of authentic mountain hospitality — a place without grid electricity, but full of the warmth of a wood stove and stories told by headlamp. Generations of mountaineers learned respect for the mountain here, finding a second home within its three log walls.

Unfortunately, its long history of more than six decades was cut short. On the dark night of Friday, May 8, 2026, the flames consumed everything. By morning, where guitar songs had once echoed, nothing remained but a pile of ash and painful memories. The silence that settled over the valley was a heavy one, of mourning.

But the spirit of Gențiana did not burn with the wood. The community of mountain lovers refused to accept this ending. Today, though the old logs are gone, the intention to rebuild the cabin has become a new gathering point. Gențiana will rise again from her own ashes, to remain the guiding beacon of the Pietrele valley for all who feel the call of the ridges.

The road back

Three phases, 18–24 months. Every invoice lands on the transparency page the week it's paid.

Phase 1Summer 2026
Clearing, survey, permits
We clear the site, scan what remains of the foundation, get the building permit. Until those land, no stone moves.
Phase 2Autumn 2026 – spring 2027
Structure, roof frame, roofing
Local stone for the foundation. The old chimney is reinforced and kept as the central element.
Phase 3Summer – autumn 2027
Finishes, stove, first supper
Interior, new stove, furniture. Reopening possible autumn 2027.

Life at Gențiana

A few images of the place, as hikers knew it.

Gallery photo
Gallery photo
Gallery photo
Gallery photo
Gallery photo
Gallery photo
Image 1 of 6
· Donate

Direct bank transfer

All donations land directly in the account of the Floarea Reginei Association, which manages the rebuild. Use the details below in your banking app.

IBAN
RO77 RNCB 0162 0198 2180 0002
Beneficiary
Asociația Montan Club Floarea Reginei Valea Jiului
Tax ID
10022340
Bank
Banca Comercială Română (BCR)
Address
Jud. Hunedoara, Loc. Hunedoara, Str. Libertății 18
Payment reference
„Donatie Gentiana”
Important: in the transfer details write exactly Donatie Gentiana. That's how we can track every contribution on the transparency page.